Scroll

Created with Pixso.

Top

Created with Pixso.

Phone
I have read and accept the privacy policy

Thank you for filling out the form, we will contact you shortly

return to the site

Sorry, the calculator will be working soon. Our specialists are currently working on the functionality.

return to the site

0

en

Electric heated and water bath type

gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
Created with Pixso.
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
gas installation
Created with Pixso.
TECHNICAL DATA
  • Type: Electric with water bath

  • Electrical Parameters: 380V 3P 50(60)Hz

  • Heating Power: 4.5 - 180 kW/h

  • Design Pressure: 1.77 MPa

  • LPG Inlet: ANSI #300 20A(3/4")- 40A (1 1/2") with flange

  • LPG Outlet: ANSI #300 25A (1") - 80A (3") with flange

  • Mechanical float to prevent liquid LPG flow

  • 1 pcs. Safety Valve: Rego, USA, brass male, CE(PED)

  • 2 pcs. temperature regulators: Heating control / High temperature

  • 2 pcs. temperature sensors (4 signals): Heating control / High temperature / Output signal (Solenoid valve)

  • Gas pressure gauge: STS304, CE(PED)

  • Gas thermometer, bimetal temperature switch

  • Solenoid valve at the liquid phase LPG inlet with CE(ATEX) certificate

  • 3 pcs. temperature regulators: Heating control / High temperature / Solenoid valve

  • Control panel on the LPG Vaporizer in EX version

  • Manufacturer: Korea Gas Engineering & Made in Korea

gas installation
Specification
table
Safety and security features of KGE vaporizers
gas plant description

1

Flange connection on the outlet
of the vaporized LPG phase from
the vaporizer.

2

Flange connection on the inlet of the liquid phase LPG to the vaporizer.

3

Electromagnetic valve on the inlet of the liquid phase LPG to the vaporizer.

gas installation

1

Reset button for the float valve to the open position.

2

Flange connection on the outlet of the vaporized LPG phase from the vaporizer.

3

Location of the float valve blocker on the outlet of the vaporized LPG phase from the vaporizer.

Triangles
Download filesTo download files, please fill out the short form

OPERATING MANUAL of LPG VAPORIZER KEV-SR model

loader

Drawings of LPG vaporizers in technical projects

loader

Brochures of LPG VAPORIZER KEV-SR model with CE

loader

CE PED CERTIFIACTE OF VAPOPRIZER LPG all series

loader

CE ATEX CERTIFICATE OF VAPOPRIZER LPG KEV-SR model

loader

PRESENTATIONS VAPOPRIZER LPG all series

loader
Phone
I have read and accept the privacy policy
The main equipment of the PROPANE + AIR system

About I-Maximum Company

I-MAXIMUM - engineering company that provides energy solutions for industrial LPG systems, Synthetic Natural Gas (SNG). Offers gas installation technologies for enriching biogas and biomethane.

About company
logo i-maximum
Certificate
certificate
Our installations
tap
About company KGE
logo kge

I-Maximum in numbers

setting
1

The first manufacturing of GAS mixers in Poland

setting
20

20 years of engineering experience

kge
+500

More than 500 installed LPG vaporizers

gas installation
+10

More than 10 installed SNG mixers

Our services

Welding of gas equipment
welder
Technical design
blueprints
Installation of gas equipment
tap
Supply of LPG and SNG equipment
gas installation

Presentation of the new I-Maximum manufacturing plant

Dear Sir/Madam!

Presentation of the new I-Maximum manufacturing plant. Event on April 26, 2024 near Warsaw as part of the Gaseous Fuels Forum 2024. If you are interested in receiving videos of all presentations, please view the program of production presentations and fill out the subscription form at the following link: https://i-maximum.com/presentation2024 

Sincerely,

The I-Maximum team

free consultationfill out the short form below and we'll get back to you within one business day
Phone
I have read and accept the privacy policy
bossSwietoslaw KariuknetworkHead of the sales department