Electric heated and water bath type
Type: Electric with water bath
Electrical Parameters: 380V 3P 50(60)Hz
Heating Power: 4.5 - 180 kW/h
Design Pressure: 1.77 MPa
LPG Inlet: ANSI #300 20A(3/4")- 40A (1 1/2") with flange
LPG Outlet: ANSI #300 25A (1") - 80A (3") with flange
Mechanical float to prevent liquid LPG flow
1 pcs. Safety Valve: Rego, USA, brass male, CE(PED)
2 pcs. temperature regulators: Heating control / High temperature
2 pcs. temperature sensors (4 signals): Heating control / High temperature / Output signal (Solenoid valve)
Gas pressure gauge: STS304, CE(PED)
Gas thermometer, bimetal temperature switch
Solenoid valve at the liquid phase LPG inlet with CE(ATEX) certificate
3 pcs. temperature regulators: Heating control / High temperature / Solenoid valve
Control panel on the LPG Vaporizer in EX version
Manufacturer: Korea Gas Engineering & Made in Korea
1
Flange connection on the outlet
of the vaporized LPG phase from
the vaporizer.
2
Flange connection on the inlet of the liquid phase LPG to the vaporizer.
3
Electromagnetic valve on the inlet of the liquid phase LPG to the vaporizer.
1
Reset button for the float valve to the open position.
2
Flange connection on the outlet of the vaporized LPG phase from the vaporizer.
3
Location of the float valve blocker on the outlet of the vaporized LPG phase from the vaporizer.
OPERATING MANUAL of LPG VAPORIZER KEV-SR model
Drawings of LPG vaporizers in technical projects
Brochures of LPG VAPORIZER KEV-SR model with CE
CE PED CERTIFIACTE OF VAPOPRIZER LPG all series
CE ATEX CERTIFICATE OF VAPOPRIZER LPG KEV-SR model
PRESENTATIONS VAPOPRIZER LPG all series
I-MAXIMUM - engineering company that provides energy solutions for industrial LPG systems, Synthetic Natural Gas (SNG). Offers gas installation technologies for enriching biogas and biomethane.
I-Maximum in numbers
1
The first manufacturing of GAS mixers in Poland
20
20 years of engineering experience
+500
More than 500 installed LPG vaporizers
+10
More than 10 installed SNG mixers
Our services
Presentation of the new I-Maximum manufacturing plant
Dear Sir/Madam!
Presentation of the new I-Maximum manufacturing plant. Event on April 26, 2024 near Warsaw as part of the Gaseous Fuels Forum 2024. If you are interested in receiving videos of all presentations, please view the program of production presentations and fill out the subscription form at the following link: https://i-maximum.com/presentation2024
Sincerely,
The I-Maximum team